Archives by date

You are browsing the site archives by date.

UBC’s Old Powerhouse featured in Art Installation

UBC’s Old Powerhouse featured in Art Installation

Old Powerhouse is an experimental artwork that centres upon two architectural forms: the pyramids of Ancient Egypt, and an electrical powerhouse located on the University of British Columbia campus.

UBC Sprinkling Restrictions and Water Regulations

Here we are in the dog days of summer, yet we are lucky to still be only at Stage 1 of Metro Vancouver’s Water Regulations.

UBC recognized at APPA awards for creating a sustainable campus

For a second time in six years, the University of British Columbia (UBC) was honoured with a Sustainability Award from APPA. The award recognizes efforts to embed sustainable policies and practices across the institution.

UBC’s Energy and Water Story

UBC’s Energy and Water Story

See how energy and water consumption at UBC have evolved over the past 16 years!

UBC recognized by FortisBC with Efficiency in Action Award

UBC was among 11 B.C. organizations recognized by with an Efficiency in Action Award for their dedication to conserving energy.

UBC Campus Energy Centre short listed for the 2017 AIBC Architectural Awards

The University of British Columbia’s Campus Energy Centre (CEC), a state-of-the-art hot water boiler facility that provides the heating requirements for UBC’s Vancouver campus, was short listed for the 2017 AIBC Architectural Awards.

Replacing our fluorescent lights with LEDs

UBC Building Operations and Energy & Water Services have teamed up with BC Hydro and the Province of BC to replace existing T8 fluorescent lights on campus with LED lights.

Innovative software converts Wi-Fi data into energy savings

For the first time in Canada, a University of British Columbia engineer has found a way to use Wi-Fi to determine the number of building occupants and adjust ventilation accordingly – saving energy without sacrificing air quality.

Hot water quality at UBC’s Point Grey campus

Due to unexpected equipment (i.e. heat exchanger) failures, HOT WATER quality is being monitored across campus. In an abundance of caution, we are posting notices at all HOT WATER faucets in 56 building complexes that contain the problematic heat exchangers. In effected campus buildings we have begun daily visual inspections of mechanical rooms and their […]

Joint Health & Safety Committee transitions to pilot in Building Operations, Energy & Water, and Student Housing & Hospitality Services

In order to enhance our safety culture, UBC is redesigning our University Health and Safety Committee (UHSC). Starting in April, Risk Management Services (RMS) will pilot a new structure with Building Operations, Energy & Water Services, and Student Housing and Hospitality Services (SHHS)—departments whose work puts them at higher risk for safety issues. Once the […]