Originally designed to run off the syngas produced from the gasification of biomass at the Bioenergy Research Demonstration Facility (BRDF), this innovative GE Janbacher engine is now capable of running off renewable natural gas as well.
With feature windows on the ground floor showcasing the boiler hall, the Campus Energy Centre (CEC) pulls back the curtain on UBC’s energy production processes.