Archives by date

You are browsing the site archives by date.

UBC Campus Energy Centre short listed for the 2017 AIBC Architectural Awards

The University of British Columbia’s Campus Energy Centre (CEC), a state-of-the-art hot water boiler facility that provides the heating requirements for UBC’s Vancouver campus, was short listed for the 2017 AIBC Architectural Awards.

Replacing our fluorescent lights with LEDs

UBC Building Operations and Energy & Water Services have teamed up with BC Hydro and the Province of BC to replace existing T8 fluorescent lights on campus with LED lights.